My Blog List

Saturday, January 14, 2017

Testing Phase

I have a small section of the layout that I started in the later part of October 2016 to test my ideas on roadbed and track, and see what its survivability would be throughout the winter. The section in the last 3 months has gone through rain, snow, extreme temperature shifts in a 24 hour period and now an ice storm, so far everything has come through with no visible problems.


End of the line
I will be posting soon on how I did my roadbed and a list of materials.

No comments:

Post a Comment